Shallow Geocellular Sub-base System

Our Shallow Geocellular Sub-base System uses 82 mm polypropylene elements for drainage and water management units situated beneath paving, landscaping and podium decks. AQUA provides the component mix and coordinates the needed auxiliary materials based on your project drawings, water destination and the conditions of the installation.

  • Five component formats for main areas, edges, laps and corners.
  • Drainage, infiltration, lined attenuation and irrigation configurations.
  • Product selection, inspection, export packing and technical support.
White interlayer connector seated in a black cellular panel
Connection detail from the supplied component range.
Specifications
82 mm Nominal component height
PP Polypropylene components
95% Nominal void ratio
5 formats Layout and edge components

Shallow Drainage for Paving, Landscapes and Podiums

AQUA Rain Water assists clients in matching shallow geocellular components to the available sub-surface area. The finished pavement section determines structural adequacy; the surface, the bedding layer, the protective layer and the cell, the ground and the design must all be reviewed.

Shallow Geocellular Sub-base System
SYSTEM // STRUCTURAL SCHEMATIC
APPLICATIONS

Permeable paving

To manage both rainwater and surface water, use a permeable sub base layout in paved areas of the development. The bedding, filtration and load-distribution layers of driveways, permeable block paving areas and concrete paving blocks must be designed in coordination.

APPLICATIONS

Landscaped areas

Shallow drainage beneath planting and public spaces must be provided with a means to control excess water. For water to reach the root zone, ensure a capillary arrangement that is consistent with the planting design is specified.

APPLICATIONS

Green roof and podium applications

Coordinate the drainage layer with the roof slab, saturated weight, waterproofing protection, outlets and overflow. We will assess the arrangement of the proposed components against the project requirements. NYC Buildings guidance identifies saturated-load analysis and accessible roof drainage.

APPLICATIONS

Sports and hardscape surfaces

Artificial turf and hard landscaping require different surface and drainage specifications. So that the module layout can be assessed, please submit the specification for the surface including traffic loads and total available depth.

SPECIFICATIONS

Component height within the full build-up

An ultra-shallow 82 mm cell layer does not set the excavation depth. Considering it as the entire section risks a discrepancy at target levels.

The design of permeable pavements integrates both hydraulic storage and structural requirements. The Minnesota Stormwater Manual explains this distinction.

PP Components and Supporting Layers.

We supply polypropylene components and coordinate the geotextile and geomembrane required for the ordered system. Filter selection, protection and containment follow the drainage function, soil conditions and adjacent construction.

SYSTEM COMPONENTS
Shallow Geocellular Sub-base System Components
Role in the assembly

Form the connected void layer

Detail to include in your enquiry

Model mix, plan dimensions, levels and arrangement

Role in the assembly

Connect stacked components where specified

Detail to include in your enquiry

Connection positions and approved layer layout

Role in the assembly

Separation, filtration or protection, according to grade

Detail to include in your enquiry

Soil/filter compatibility and installation position

Role in the assembly

Contain water in a lined attenuation configuration

Detail to include in your enquiry

Material specification, joints and penetrations

Role in the assembly

Separate vulnerable surfaces from contact damage

Detail to include in your enquiry

Liner or waterproofing requirements

Role in the assembly

Transfer stored water towards the root zone

Detail to include in your enquiry

Planting medium and irrigation arrangement

For a permeable paving system, the layers below the paving must also accommodate the paver joints and bedding as well as the jointing grit. Clean graded gravel or crushed rock has a different function from a compact, fines-rich aggregate; the surface designer specifies the grading and compaction.

Drainage, Infiltration and Attenuation Configurations

Our component range can be used to undertake various water management scenarios providing the required layers and connections are used. First, the required end destination of the water must be selected, followed by the enclosure, outlets and access provisions.

Depth-to-Discharge Configuration Map

Drainage
Assembly provisions Filter/protection layers and an uninterrupted discharge route
Project decision before supply Surface inflow, falls, outlet level and downstream connection
Infiltration
Assembly provisions Permeable enclosure and a suitable receiving ground profile
Project decision before supply Infiltration testing, groundwater, contamination and setbacks
Lined attenuation
Assembly provisions Impermeable geomembrane, protection, inlet, controlled outlet and inspection access
Project decision before supply Storage requirement, discharge limit, overflow and liner details
Passive irrigation
Assembly provisions Water-retaining arrangement, capillary components and root-zone interface
Project decision before supply Retained water level, planting demand and excess-water drainage

If the required ground conditions are met, infiltration may be used. A geocellular soakaway relies on the receiving soil. In contrast, a lined geocellular storage tank is used to hold water for controlled release; Susdrain distinguishes these functions.

Nominal voids and usable storage

The 95% void ratio describes the component geometry. Usable water storage depends on the assembled layout and operating water levels, including the outlet, overflow and any retained irrigation water; it needs a separate hydraulic calculation.

Shallow Geocellular Component Sizes

Our range includes five formats for the main field and its perimeter details. Use the model references to prepare the component schedule, including edges, openings and changes of direction, as shown on the drawing.

95% Nominal void ratio (Component reference)
≥52% Surface opening ratio (Component reference)
Shallow Geocellular Component Details
Model / parameter Dimensions or value Reference weight Layout role
H5082 500 × 577 × 82 mm 2.05 kg Main component
H2582 250 × 577 × 82 mm 1.20 kg Horizontal edge
H1582 500 × 143 × 82 mm 0.60 kg Vertical edge
H1082 100 × 577 × 82 mm 0.50 kg Lap detail
H1382 500 × 130 × 82 mm 0.50 kg Corner detail

Quantity take-off from the layout

The outer dimensions of components are not a net installed coverage formula. We determine the final quantities of components, connectors and packing once we confirm the component arrangement and mix. Therefore, boundary pieces are included in the supply schedule.

Pricing and Supply Planning

Your supply quotation shows layout, quantities, supporting materials, and destination. Installed cost is more than cell cost, so make sure you evaluate all proposals based on the same level, drainage duty and traffic conditions.

Geocellular Stormwater Modules Production and Delivery
SUPPLY & LOGISTICS // 01
QUOTATION FACTORS

Six inputs that shape the quotation

  • 01

    Component mix: main, edge, lap and corner quantities.

  • 02

    System function: drainage, infiltration, lined storage or irrigation.

  • 03

    Supporting materials: filter, protection, membrane and connection requirements.

  • 04

    Project conditions: access, delivery sequence and handling restrictions.

  • 05

    Inspection scope: requested documents, witness testing and loading supervision.

  • 06

    Shipment: destination, packing arrangement and consolidation requirements.

EVALUATION

Complete-system cost comparison

Maintain the same project boundaries for both options: product supply, freight, excavation and disposal, supporting layers, drainage fittings, installation and maintenance. In the worksheet, you must separate amounts that are missing from zero costs. Therefore, an incomplete quote cannot seem to be cheaper automatically.

PLANNING

Production and delivery schedule

The supply programme is confirmed after the component configuration, materials and inspection scope are agreed. Please specify your required site date and delivery sequence; production scheduling and transit are part of that programme.

Quality Control and Product Documentation

Our factory was established in 2009, and our core moulded-product operation is supported by 30 injection-moulding machines and two-shift production. Product selection, inspection review and loading checks are coordinated with the documentation agreed for your order.

Shallow Geocellular Sub-base System QC Process
AQUA Rain Water · Factory quality-control process

Inspection and loading support

“Customers can arrange factory-witnessed tests or receive test video when agreed.”
PROCEDURE _01

Core moulded products undergo approximately 2% batch sampling, covering dimensions, colour, appearance and compression.

PROCEDURE _02

Our factory has a compression testing machine for internal and agreed witness testing.

PROCEDURE _03

Before loading, we review product configuration, inspection status and packing.

PROCEDURE _04

Factory audits, remote video inspection and loading supervision can be arranged by agreement.

PROCEDURE _05

Selected product test reports and company certificates are available according to the product and order.

Load evidence for the proposed system

For a high-strength sub-base replacement design, the engineer needs more than a short-duration compression value. Check the material, tested arrangement, deformation, load duration and long-term creep along with the cover, subgrade and traffic conditions; geocellular structural research identifies these system-level considerations.

From Project Layout to Product Supply

SYSTEM LAYOUT OVERVIEW
Shallow Geocellular Sub-base System Layout Configuration
01
Send the project section.
The footprint, available depth, finished surface, water management function and loads should be included.
02
Please review the layout of the components.
We cover the model mix, connections, supporting materials, and what is required to make your selection.
03
Agree on the supply scope.
The quotation captures the ordered products, inspection requirements, packing, and delivery requirements.
04
Review inspection and packing.
We provide the agreed-upon reviews of the product checks, as well as a loading plan.
05
Release the shipment.
Product configuration and packaging are checked prior to loading. Supervision can be arranged.
06
Support the site team.
Remote guidance and on-site technical support can be arranged; the project contractor carries out installation construction.

Maintenance access and ownership

Mark the inlet, silt-control points, inspection access, and discharge route on the handover drawing. Agree on post-landscaping or paving access maintenance and cleaning of drainage fittings and surface.

Design, supply and installation

We coordinate product supply and supporting documents. Your project designers will ensure structural adequacy, hydraulic performance, roof waterproofing and overflow details, while the installation team will implement the approved construction method.

Component and Connection Details

These AQUA Rain Water component photographs show the connector and marked connection positions for layout discussions. Request a drawing review with your proposed layer arrangement so connection details can be checked against the supply schedule.

Site Conditions That Change the Configuration

Sub-base replacement works within an engineered section. Confirm what the cells are replacing and what is remaining in the pavement or landscape build-up prior to excavation comparison.

SPECIFICATIONS

Three comparisons to make before specifying

  • A thinner cell layer doesn’t always translate to a cheaper total installed cost. Take into consideration the complete section and maintenance scope.
  • A 95% nominal void ratio does not necessarily equal usable storage: confirm against the layout, outlet and overflow levels.
  • A short-duration compression result is not sufficient structural verification for allowing traffic loads.

ENCLOSURE DESIGN

Choosing the enclosure

Permeable geotextile and an impermeable geomembrane are not interchangeable. The trade-off depends on where the water goes. Infiltration requires an appropriate subgrade, whereas attenuation (when lined) requires a defined path for controlled discharge.

Site Conditions Geocellular Stormwater Configuration
SYSTEM CONFIGURATION // CAD-04
CONDITION MATRIX
Site condition Design implication Next action
Poor infiltration or high water table A soakaway may not drain as intended Review a lined attenuation route and the permitted discharge
Heavy or concentrated traffic loads Cover and load distribution become critical Submit the complete section for structural review
Silt or construction debris entering the system Filter surfaces and drainage routes can become clogged Specify pretreatment and construction-stage protection
Shallow outlet or restricted discharge Usable water depth and emptying may be constrained Check operating levels, controls and overflow
Simple site with ample aggregate depth A conventional solution may meet the same duty Compare complete costs and maintenance access
Surface cleaning and sediment control maintenance
PROCESS & MAINTENANCE

Surface cleaning and sediment control

Include both in the stormwater management system from the planning stage. England’s national SuDS standards address site suitability and long-term operation; applicable local requirements govern the final design and discharge to a sewer or waterway.

Shallow Geocellular Sub-base System Tools

Configuration Map

Cost Worksheet

Enquiry Checklist

Shallow Geocellular Sub-base FAQs

No, 82 mm is the nominal component height. The complete build-up also includes the specified surface, bedding, protection and support layers; available depth must be checked against the project section.

The approved structural and drainage designs establish the replacement scope. Within the conventional aggregate section, some space may be allocated to a shallow geocellular sub-base replacement system. The bedding, protection and support layers can be retained as specified.

The nominal ratio describes void space within a component, rather than usable storage capacity. Final positioning and operating levels, including outlet and overflow elevations, must be considered when determining usable capacity to avoid double-counting temporary attenuation and permanent retention.

Infiltration sends water into suitable ground. Lined attenuation stores water for controlled release over time. Decide on a configuration based on groundwater and soil tests, water quality, and the approved outfall.

Traffic suitability is established for the complete construction, including cover, support and long-term loading. Send the vehicle or pavement loading specification with the section drawing so the required product evidence can be used for the design.

A green roof or podium proposal requires saturated build up weight, structural deck capacity, waterproofing interface, and drainage detailing. Select the cellular layer together with protection, inspection access and overflow provisions.

A passive irrigation system requires a water retaining structure and capillary connection to the growing medium. The cellular void layer is only part of that system; specify the capillary components and retained water level together.

Design a surface cleaning method. Capture sediment and provide access for clear and easy inspection of inlets, outlets, and control fittings.

Set the site’s maintenance method and frequency. Before handover record the operator to which the maintenance responsibility will be delegated.

Compare the same paved area, finished level, loading and drainage duty. Include freight, excavation, disposal, supporting layers, fittings, installation and maintenance, as well as the unit price. Use our cost worksheet to identify missing inputs.

Send the layout and section, project location, surface use, required function and site date. Include known quantities for H5082, H2582, H1582, H1082 and H1382, plus any supporting-material or inspection requirements.

Some reports on selected tests and company-related documents are available on product and order basis. Factory audits, remote inspections, and witnessed tests can be arranged on contract; define the scope and documents in your request.

We supply products, supporting materials and product-related documents, with technical support arranged for the project. The project contractor implements the approved design and method for the installation. The construction is done according to the approved design and methodology.